LNER engineering works (Updated November 2026)

Jay Harlow
Published: Nov 23, 2026

If you're planning a trip on the East Coast Main Line over the coming month, this post details all the LNER engineering works scheduled for these dates.
LNER's engineering works usually take place on weekends, public holidays, and quieter travel periods to keep disruption to a minimum. While they may seem a nuisance, these scheduled maintenance periods are all about keeping the rails in top condition, so LNER can keep running a reliable service for years to come.
Luckily, there are always rail replacement buses or alternative services running to take you where you need to go. This guide covers all the upcoming LNER engineering works for 2026, along with tips on what to do if your route is affected and how to plan ahead.
(All information taken from LNER's engineering works page, which can be found here).

What's the best way to use this guide?
We'd recommend pressing CTRL+F on this page and typing in any relevant station or route for your planned travel to check whether any planned disruptions are coming up.
LNER engineering works at a glance (November)
- Northallerton to Doncaster closure (November 1): No LNER services will run between Northallerton and Doncaster, disrupting journeys between London, Yorkshire, the North East, and Scotland. Trains will start or terminate at different stations, with replacement buses operating between Darlington, York, Northallerton, and Doncaster.
Pasted markdown(6).md
- Inverness-Perth disruption (November 6-9): Several London-Inverness services will start or terminate at Perth instead, with replacement buses operating between Perth and Inverness. Some services will also call at Aviemore, Kingussie, and Pitlochry, although passengers traveling on November 9 will need to use other operators for these stations.
Pasted markdown(6).md
- East Coast route changes (November 15-17): Early morning and late evening engineering works will cause several services between London, Yorkshire, Newcastle, and Scotland to start or terminate at different stations, or be canceled. Replacement buses will operate between York and Newcastle on November 15, while some services to Edinburgh will be retimed or diverted on November 16-17.
Pasted markdown(6).md
- London King's Cross to Peterborough closure (November 28-29): No LNER services will run to or from King's Cross on either day as part of the East Coast Digital Programme. A reduced service will operate between Peterborough and Scotland or Leeds, with replacement buses connecting Peterborough and Bedford for Thameslink services into London. Services to Hull, Lincoln, and other destinations will also be affected, and journeys will take significantly longer.
Pasted markdown(6).md
- Further East Coast changes (November 30-December 3): Late-night services between King's Cross and Leeds will bypass Wakefield Westgate, with replacement buses from Doncaster. Some Edinburgh-London trains will also arrive up to 15 minutes later, while early morning services on November 30 will be retimed, diverted, or canceled.
No LNER services between Northallerton and Doncaster (Sunday, November 1, 2026)
There will be No LNER train services between Northallerton and Doncaster in either direction.
LNER train services to/from the North will start/terminate at Northallerton or Darlington.
LNER train services to/from the South will start/terminate at Doncaster.
Rail replacement buses will operate to connect with LNER train services at Darlington and Doncaster.
Rail replacement buses will operate between Darlington and Doncaster, connecting with LNER train services at Doncaster for stations to London King's Cross, and at Darlington for stations to the North East and Scotland.
Rail replacement buses will operate between York and Wakefield Westgate to connect with LNER train services for stations to London King's Cross, and between York and Darlington to connect with LNER train services for stations to the North East and Scotland.
Rail replacement buses will operate between Northallerton and York. Separate rail replacement buses will then operate from York to Wakefield Westgate to connect with LNER train services for stations to London King's Cross.
LNER train services will start/terminate at Northallerton for stations to the North East and Scotland.
Other LNER routes may also be affected as a result of these works. All LNER customers are advised to check their journey before they travel.
Late evening services affected between King's Cross and Peterborough (Monday, November 2, to Thursday, November 5, 2026)
The 19.25 from Edinburgh Waverley to London King's Cross and the 20.20 from Edinburgh Waverley to London King's Cross will arrive at King's Cross slightly later than usual.
The 22.40 from King's Cross to Leeds, the 23.08 from King's Cross to York, and the 23.33 from King's Cross to Leeds will arrive at Peterborough and subsequent stations later than usual.
Changes to early morning services following weekend engineering works (Monday, November 2, 2026)
The 04.40 from York to King's Cross will start at Doncaster at 05.08.
The 05.20 from Doncaster to Edinburgh Waverley will leave Dunbar one minute later and arrive at Edinburgh eight minutes later than usual.
The 06.35 from Harrogate to King's Cross will start at Leeds at 07.15.
The 08.33 from Harrogate to King's Cross will start at Leeds at 09.10.
Customers at York should catch the next available LNER service, and customers at Harrogate and Horsforth should use Northern services to connect with the next available LNER service.
The 12.03 from London King's Cross to Inverness will terminate at Perth (Friday, November 6, 2026)
A nonstop rail replacement bus service will operate from Perth to Inverness. Passengers for Pitlochry, Kingussie, and Aviemore should catch the next available ScotRail service.
Inverness services will start and terminate at Perth (Saturday, November 7, 2026)
The 07.55 from Inverness to London King's Cross will start at Perth and the 12.03 from London King's Cross to Inverness will terminate at Perth. Rail replacement buses will operate in both directions between Inverness and Perth, calling at Aviemore, Kingussie, and Pitlochry.
Inverness services will start and terminate at Perth (Sunday, November 8, 2026)
The 12.03 from London King's Cross to Inverness will terminate at Perth and the 09.40 from Inverness to London King's Cross will start at Perth. Rail replacement buses will operate between Inverness and Perth, calling at Aviemore, Kingussie, Pitlochry, and Dunkeld & Birman (southbound only).
The 07.55 from Inverness to London King's Cross will start at Perth (Monday, November 9, 2026)
A nonstop rail replacement bus service will operate between Inverness and Perth. Customers traveling from/to Aviemore, Kingussie, and Pitlochry are advised to use other operators' services.
Changes to some services due to early morning engineering works (Sunday, November 15, 2026)
The 07.58 from York to London King's Cross will terminate at Peterborough.
The 08.36 from London King's Cross to Harrogate will start at Peterborough.
The 08.58 from Newcastle to London King's Cross will terminate at Doncaster.
The 08.30 from London King's Cross to Edinburgh Waverley will start at York.
The 09.03 from London King's Cross to Edinburgh Waverley will start at Doncaster.
The 08.15 from Doncaster to London King's Cross will be canceled.
The 22.03 from London King's Cross to Newcastle will terminate at York (Sunday, November 15, 2026)
Rail replacement buses will operate between York, Northallerton, Darlington, Durham, and Newcastle.
The 04.35 from Newcastle to London King's Cross will start at York at 05.57 (Monday, November 16, 2026)
Customers traveling from Newcastle, Durham, Darlington, and Northallerton should use our journey planner to find alternative services.
Changes to the 20.03 from London King's Cross to Edinburgh Waverley and the 19.33 from London King's Cross to Newcastle (Monday, November 16, and Tuesday, November 17, 2026)
The 20.03 from London King's Cross to Edinburgh Waverley will terminate at Newcastle and will no longer call at Alnmouth, Berwick-upon-Tweed, and Edinburgh Waverley. Customers traveling to those stations are advised to travel on the 19.33 from London King's Cross.
The 19.33 from London King's Cross to Newcastle will be extended to run through to Edinburgh Waverley. The service will also call at Alnmouth and Berwick-upon-Tweed. This will be the last service of the day to Alnmouth, Berwick, and Edinburgh.
The 22.40 from London King's Cross to Leeds will use a diversionary route as a result of engineering works and will not call at Wakefield Westgate (Monday, November 16, to Thursday, November 19, 2026)
Passengers for Wakefield should get off at Doncaster for a rail replacement bus service.
Changes due to early morning engineering work between London King's Cross and Peterborough (Sunday, November 22, 2026)
The 07.58 from York to London King's Cross will terminate at Peterborough.
The 08.36 from London King's Cross to Harrogate will start at Peterborough.
The 08.58 from Newcastle to London King's Cross will terminate at Doncaster.
The 08.30 from London King's Cross to Edinburgh Waverley will start at York.
The 09.03 from London King's Cross to Edinburgh Waverley will start at Doncaster.
The 08.15 from Doncaster to London King's Cross will not run.
The 09.35 from Bradford Forster Square to London King's Cross will start at Leeds.
The 22.40 from London King's Cross to Leeds will use a diversionary route as a result of engineering works and will not call at Wakefield Westgate (Monday, November 23, to Thursday, November 26, 2026)
Passengers for Wakefield should get off at Doncaster for a rail replacement bus service.
No LNER services between London and Peterborough as part of the East Coast Digital Programme (Saturday, November 28)
There will be No LNER services to or from London King's Cross.
LNER will run a reduced service, in both directions, between Scotland and Peterborough and Leeds and Peterborough.
Customers traveling to or from Central London can take a rail replacement bus service between Peterborough and Bedford to connect with Thameslink services to/from London St Pancras.
Affected journeys will be significantly longer than usual.
There will be No LNER services to or from Hull, and there will be a reduced service on some of our other routes.
There will be No LNER services to or from Lincoln. Rail replacement buses will operate between Lincoln and Newark Northgate, connecting into/out of LNER train services at Newark.
Some services will start from or terminate at different stations than usual, and some services will be canceled.
No LNER services between London and Peterborough as part of the East Coast Digital Programme (Sunday, November 29)
There will be No LNER services to or from London King's Cross.
LNER will run a reduced service, in both directions, between Scotland and Peterborough and Leeds and Peterborough.
Customers traveling to or from Central London can take a rail replacement bus service between Peterborough and Bedford to connect with Thameslink services to/from London St Pancras.
Affected journeys will be significantly longer than usual.
There will be No LNER services to or from Lincoln, Skipton, or Hull, and there will be a reduced service on some of our other routes.
Some services will start from or terminate at different stations than usual, and some services will be canceled.
The 19.25 and 20.20 from Edinburgh Waverley will arrive later at London King's Cross (Monday, November 30, to Thursday, December 3, 2026)
The 19.25 and 20.20 from Edinburgh Waverley to London King's Cross will use a diversionary route near Stevenage and will arrive up to 15 minutes later than usual at King's Cross.
The 22.40 from London King's Cross to Leeds will not call at Wakefield Westgate (Monday, November 30, to Thursday, December 3, 2026)
Customers for Wakefield should get off at Doncaster for a rail replacement bus service.
Changes on Monday morning as a result of engineering work the previous day (Monday, November 30)
The 05.48 from London King's Cross to Aberdeen will start at Leeds at 07.40.
The 05.20 from Doncaster to Edinburgh Waverley will start at Newcastle at 06.52.
The 06.30 from London King's Cross to Edinburgh Waverley will start at Peterborough at 07.03.
The 05.40 from London King's Cross to Leeds will start at Doncaster at 07.20.
The 06.40 from London King's Cross to Leeds will be canceled.
The 06.33 from London King's Cross to Newcastle will be canceled.
The 08.33 from Harrogate to London King's Cross will start at Leeds at 09.10.
The 10.33 from Harrogate to London King's Cross will start at Leeds at 11.10.
The 06.45 from London King's Cross to Lincoln will depart King's Cross at 06.40, five minutes earlier than usual. The service will also not call at Stevenage.
The 09.47 from London King's Cross to York will depart King's Cross at 09.45, two minutes earlier than usual.
What to do if your LNER route is affected by engineering works?
If your journey falls on one of the dates listed above, there's no need to worry: when LNER engineering works take place, there's almost always an alternative service to take you where you need to go. Here's what to do if your route is affected by LNER disruption:
Rail replacement buses are perhaps the most common alternative. These run between the stations where trains aren't operating and are free to use with your existing LNER ticket. They do take a bit longer than the train; a bus between York and Darlington, for example, adds roughly an hour to your trip, so make sure you factor that into your plans.
In some cases, LNER will run a truncated service instead. This means trains still operate on part of the route, just not the full line. A good example is when services run between London King's Cross and York as normal, with replacement buses covering the closed section north to Darlington. You'd transfer at York, hop on the rail replacement bus, then pick up another LNER train from Darlington if you're heading further north to Newcastle or Edinburgh.
Occasionally, services are diverted via alternative lines, which can add 20 to 40 minutes depending on the detour. LNER will confirm exact timings once amended schedules are published; this is usually 2 to 4 weeks before the works. You'll then be able to see these on Trip.com.
Here are a few tips to keep your journey on track:
- Build in extra time, especially if you have onward connections in Edinburgh or Newcastle. A 15-minute buffer can save a lot of stress if the replacement bus runs behind.
- Travel earlier in the day where you can. Morning services tend to be less affected and replacement buses are generally quieter before lunchtime.
- Book your tickets after the amended schedule goes live. This way, you'll see the adjusted departure times and won't end up on a service that's been canceled.
- If you're heading up for the weekend and the engineering works affect late evening services, it might be worth booking an overnight stay in York or Edinburgh rather than risking a long journey home. Browse hotels in York or Edinburgh to find somewhere to stay.
Stations most affected by LNER engineering works
Some sections of the East Coast Main Line are more prone to engineering works than others, so it's helpful to know which parts of the route are most frequently affected.
London King's Cross is where All LNER services begin and end, so any work near the station has a ripple effect across the whole network. Weekend closures here can mean All LNER services start and terminate at a different London station, or that trains are diverted via Moorgate or the Thameslink corridor.
The Welwyn Viaduct in Hertfordshire is another hotspot for engineering works. This stretch of railway sees all East Coast Main Line services funneled through a narrow 2-track section, meaning LNER can only run a reduced schedule when work takes place here. If you're traveling between London and Peterborough or Stevenage, you may notice fewer trains on weekends.
The Newcastle approaches and the Scottish border sections heading into Edinburgh Waverley can also see periodic closures. Cross-border track upgrades often mean replacement buses between Berwick-upon-Tweed and Edinburgh, or services starting and finishing at Newcastle rather than going further north.
Frequently asked questions about LNER engineering works
Are LNER tickets valid on rail replacement buses?
Yes, your existing ticket is valid on any replacement bus service that's running during LNER engineering works. Just show your LNER ticket (paper or e-ticket) to the bus driver when you board.
How far in advance are East Coast Main line works announced?
LNER and Network Rail typically confirm engineering works 12 weeks ahead, with full amended schedules published 2 to 4 weeks before travel. These schedules are automatically updated on Trip.com, so you can plan ahead when using the journey planner.
Are King's Cross closures common during public holidays?
No, you're unlikely to see London King's Cross fully closed during public holidays, but there may be a reduced service in and out of the station over long weekends. LNER will always confirm alternative arrangements well in advance, so there shouldn't be any surprises.
Can I get a refund if I decide not to travel?
Yes, if there are LNER cancellations or disruptions, you can usually claim a full refund for your unused ticket under National Rail's Delay Repay scheme. Advance tickets are usually not refundable, so you can apply for a refund if you booked your Advance ticket before the engineering works were scheduled.
Do engineering works usually affect Sunday services?
Yes, Sundays are when planned engineering works usually take place, as this is when passenger numbers tend to be at their lowest. If you're a regular Sunday traveler on the East Coast Main Line, it's always worth checking for LNER disruption before you plan your trip.
Top Guides


South Western Railway (SWR) engineering works (November 2026)


Avanti West Coast upcoming engineering work 2026: is my train running?


Southern rail engineering works (November 2026)

c2c engineering work (November 2026)

Southeastern maintenance work (November 2026): is my train running?

Thameslink engineering work (November 2026)

Getting the train to the London Natural History Museum: Nearest station and popular routes

Getting the train or tube to Somerset House: Nearest station and popular routes
Table of Contents
- What's the best way to use this guide?
- LNER engineering works at a glance (November)
- No LNER services between Northallerton and Doncaster (Sunday, November 1, 2026)
- Late evening services affected between King's Cross and Peterborough (Monday, November 2, to Thursday, November 5, 2026)
- Changes to early morning services following weekend engineering works (Monday, November 2, 2026)
- The 12.03 from London King's Cross to Inverness will terminate at Perth (Friday, November 6, 2026)
- Inverness services will start and terminate at Perth (Saturday, November 7, 2026)
- Inverness services will start and terminate at Perth (Sunday, November 8, 2026)
- The 07.55 from Inverness to London King's Cross will start at Perth (Monday, November 9, 2026)
- Changes to some services due to early morning engineering works (Sunday, November 15, 2026)
- The 22.03 from London King's Cross to Newcastle will terminate at York (Sunday, November 15, 2026)
- The 04.35 from Newcastle to London King's Cross will start at York at 05.57 (Monday, November 16, 2026)
- Changes to the 20.03 from London King's Cross to Edinburgh Waverley and the 19.33 from London King's Cross to Newcastle (Monday, November 16, and Tuesday, November 17, 2026)
- The 22.40 from London King's Cross to Leeds will use a diversionary route as a result of engineering works and will not call at Wakefield Westgate (Monday, November 16, to Thursday, November 19, 2026)
- Changes due to early morning engineering work between London King's Cross and Peterborough (Sunday, November 22, 2026)
- The 22.40 from London King's Cross to Leeds will use a diversionary route as a result of engineering works and will not call at Wakefield Westgate (Monday, November 23, to Thursday, November 26, 2026)
- No LNER services between London and Peterborough as part of the East Coast Digital Programme (Saturday, November 28)
- No LNER services between London and Peterborough as part of the East Coast Digital Programme (Sunday, November 29)
- The 19.25 and 20.20 from Edinburgh Waverley will arrive later at London King's Cross (Monday, November 30, to Thursday, December 3, 2026)
- The 22.40 from London King's Cross to Leeds will not call at Wakefield Westgate (Monday, November 30, to Thursday, December 3, 2026)
- Changes on Monday morning as a result of engineering work the previous day (Monday, November 30)
- What to do if your LNER route is affected by engineering works?
- Stations most affected by LNER engineering works
- Frequently asked questions about LNER engineering works
Ready to plan your trip?
Tue, Nov 24
6:00 PM
Add return
Open Return
Search
1 adult 0 children, 0 Railcards
Explore hotels
Latest Travel Guides


South Western Railway (SWR) engineering works (November 2026)
Published: November 23, 2026


Avanti West Coast upcoming engineering work 2026: is my train running?
Published: November 23, 2026


Southern rail engineering works (November 2026)
Published: November 23, 2026

c2c engineering work (November 2026)
Published: November 23, 2026

Southeastern maintenance work (November 2026): is my train running?
Published: November 23, 2026

Thameslink engineering work (November 2026)
Published: November 23, 2026

Getting the train to the London Natural History Museum: Nearest station and popular routes
Published: November 23, 2026

Getting the train or tube to Somerset House: Nearest station and popular routes
Published: November 23, 2026

Getting the train to Sky Garden: closest station & routes
Published: November 23, 2026

Taking the train to Chatsworth House: closest station & popular routes
Published: November 23, 2026

Taking the train to The Victoria and Albert Museum (V&A): closest station and popular routes
Published: November 23, 2026

Taking the train to Longleat Safari Park: closest station & routes
Published: November 23, 2026
Latest Travel Guides
South Western Railway (SWR) engineering works (November 2026)Published: November 23, 2026
Avanti West Coast upcoming engineering work 2026: is my train running?Published: November 23, 2026
Southern rail engineering works (November 2026)Published: November 23, 2026
c2c engineering work (November 2026)Published: November 23, 2026
Southeastern maintenance work (November 2026): is my train running?Published: November 23, 2026
Thameslink engineering work (November 2026)Published: November 23, 2026
Getting the train to the London Natural History Museum: Nearest station and popular routesPublished: November 23, 2026
Getting the train or tube to Somerset House: Nearest station and popular routesPublished: November 23, 2026
Getting the train to Sky Garden: closest station & routesPublished: November 23, 2026
Taking the train to Chatsworth House: closest station & popular routesPublished: November 23, 2026
Taking the train to The Victoria and Albert Museum (V&A): closest station and popular routesPublished: November 23, 2026
Taking the train to Longleat Safari Park: closest station & routesPublished: November 23, 2026